West Hendon Regeneration - Various Phases

Hendon | London

Barratt West London
Multiple Packages. Value: £15m+

Initial Planning and Coordination

Contractual Engagement: After being subcontracted by Barratt London, City Brickwork (UK) Ltd participated in project briefings and meetings to understand the specific requirements of the West Hendon Regeneration Project.

Logistics and Scheduling: City Brickwork worked closely with Barratt’s project managers and other contractors to develop a phased schedule. This ensured that their brickwork activities would align with the broader construction timeline, avoiding bottlenecks and ensuring smooth progress.

Erection of Superstructure Brickwork

Scaffolding and Safety Measures: Once the foundations were set, scaffolding was erected to provide safe access for bricklayers at higher levels. Safety measures such as securing scaffolds and protective gear for workers were strictly enforced throughout the construction.

Bricklaying Process: Skilled bricklayers from City Brickwork laid each course of bricks for the external and internal walls. They ensured that the brickwork was plumb (vertically straight) and level at every stage. Laser levels, spirit levels, and string lines were used for accuracy.

Detailed Brickwork and Façade Elements

Architectural Detailing: In certain parts of the development, particularly on feature buildings, City Brickwork was responsible for more intricate detailing. This involved decorative brick patterns, arches, and varying textures to enhance the overall look of the facades.

Integration with Other Trades

Coordination with M&E Services: During the building process, City Brickwork coordinated with mechanical and electrical (M&E) teams to ensure that service pipes, conduits, and wiring could be seamlessly integrated into the walls.

Quality Assurance and Inspections

Ongoing Quality Control: Throughout the project, City Brickwork’s site managers conducted regular quality checks to ensure that the work adhered to Barratt’s stringent standards as well as building regulations.

Completion and Handover

Sealing and Weatherproofing: City Brickwork applied sealants and carried out any required weatherproofing measures on the external brickwork to protect the structures from moisture and ensure long-term durability.

Handover to Barratt: Upon completion, City Brickwork formally handed over the finished structures to Barratt London. This included providing documentation of work completed, materials used, and compliance with building standards.

Conclusion:

City Brickwork (UK) Ltd’s involvement in the West Hendon Regeneration Project was a critical component of the overall success of the development. Their skilled craftsmanship, attention to detail, and seamless coordination with Barratt London and other contractors resulted in high-quality brickwork that contributed both to the structural strength and aesthetic appeal of the buildings. Through efficient planning, precise execution, and a commitment to quality, City Brickwork helped deliver a modern and sustainable community in West Hendon.